The Mesquite Solar project is a photovoltaic power plant being built in Arlington, Maricopa County, Arizona, owned by Sempra Generation. Phase 1 has a nameplate capacity of 150 megawatts (MW). The project has a planned capacity of up to 700 MW when c...

Learn More View Catalog

About Mesquite Solar


About Us

The Mesquite Solar project is a photovoltaic power plant being built in Arlington, Maricopa County, Arizona, owned by Sempra Generation. Phase 1 has a nameplate capacity of 150 megawatts (MW). The project has a planned capacity of up to 700 MW when completed, making it among the world's largest PV power stations. Mesquite Solar 1 uses 800,000 solar panels from Suntech Power. The EPC contractor is Zachry Holdings.

Construction began in 2011 and was completed in 2013. Mesquite 1 is projected to generate more than 350 gigawatt-hours of electricity annually (an average of about 40 MW) and will offset roughly 200,000 tons of carbon emissions each year. Phase 1 costs about $600 million. Sempra Generation has signed a 20-year Power Purchase Agreement (PPA) with Pacific Gas and Electric Company (PG&E) for the 150 MW from Mesquite 1. In late December 2011, 42 MW was completed and connected to the grid. Sempra Energy completed the 150 MW phase of the Project in January 2013. Phase 2 (100MW) and Phase 3 (150MW) were both completed in December 2016. See less

Buckeye Valley Chamber.
A PROUD MEMBER OF

Buckeye Valley Chamber.

Scan to access our Mobile App or Click to Save to QR